Products / Export control
Footage: UK Ministry of Defence, Crown copyright, CC BY 4.0, cropped
For Defence
Helduntilconfirmed.
A military item is defined by a list. So is the answer to whether it may leave. A shipment stays back until the classification of each line is confirmed.
Why
One component can sit on three lists at once.
A fighter aircraft carries parts from many states, and each state keeps its own military list with its own numbering. The strictest reading travels with the component into the finished system.
Held against each list, position by position.
- 01 · USUnited States Munitions ListITAR · 22 CFR 121.1
- 02 · UKUK Military ListExport Control Order 2008
- 03 · DEAusfuhrliste, Teil I AGermany
- 04 · DEKriegswaffenlisteGermany · KrWaffKontrG
- 05 · FRMilitary listFrance
- 06 · SEMilitary listSweden
Military lists read position by position · no entry is shown on this page · coverage has a date, ask us for the current run
Caelex holds a part against these lists position by position, keeps the parameter that decided each candidate, and records who confirmed the classification. The decision stays with your export officers.
Product overview
Held, confirmed, on record.
Held
An order with an unconfirmed line stays blocked. Nobody has to remember to close the gate.
Confirmed
One person proposes, a second confirms. No one confirms their own proposal.
On record
Each step chained to the one before it, with who decided and when.
What it covers
From the part to the licence, in one system.

Photo: UK MOD, Crown copyright, OGL
Classification
- Held against the military lists, position by position
- The parameter that decided each candidate
- Confidence in words: high, medium or low
- Two people sign

Photo: UK MOD, Crown copyright, OGL
Shipment check
- Embargoes and sanctions lists for each order
- End use, and whether a licence is needed
- No confirmed classification, no release

Photo: UK MOD, Crown copyright, OGL
Licences and record
- Applications, quotas and decisions at the authority
- End-use statements and re-export consents
- A chained record of every decision, for the auditor
See the gate
No confirmed classification, no release.
Step 1 of 4
An order with an open line does not leave.
- Each line needs a confirmed classification
- A proposal is not a confirmation
- The order stays blocked until a second person has signed
Order SO-48211
Orbital Imaging K.K. · Tokyo, Japan
Checks
Decision
Checking…
The gate is the default. Nobody has to remember to close it.
Where it runs
Air-gapped and on-premise.
For work that cannot leave your network. The cloud runs today; a deployment inside your own network is in preparation.
- Available
Cloud
Hosted in the EU. Not for classified information.
- In preparation
On-premise
The whole stack in your own data centre, on your own hardware.
- In preparation
Air-gapped
Inside a sealed network, with no route to the outside.
Inside your own network.
Caelex is a member of NVIDIA Inception. Scope and dates of an on-premise or air-gapped deployment are agreed in writing.
Footage: NASA
On-premise and air-gapped deployment are not available today. NVIDIA and the NVIDIA logo are trademarks and/or registered trademarks of NVIDIA Corporation in the U.S. and other countries.
Built to be checked
The record answers before the auditor asks.
Not listed is not free.
An open or unknown classification never turns into a release. Where a fact is missing, the answer stays open and names the fact.
Two people sign.
One proposes, a second confirms. No one confirms their own proposal. The record names both and the time.
Rules, not a language model.
Candidates are computed by deterministic rules compiled from the official text. A language model never sets a list entry.
The software computes candidates and documents decisions. It is not legal advice and grants no export authorisation; that remains with the authority. The windows on this page play demo data.
